Subscription

PIXTA Exclusive

Stock Photo: Delivery schedule

Item number : 88983708 See all

This Stock Photo, whose title is "Delivery schedule"[88983708], includes tags of calendar, schedule, schedule book. The author of this item is taetae (No.2113531). Sizes from S to L are available and the price starts from US$5.00. You can download watermarked sample data (comp images), check the quality of images, and use Lightbox after signing up for free. See all

Delivery schedule 88983708

Delivery schedule

*PIXTA Exclusive is only available on PIXTA site or affiliated sites with PIXTA.

  • 1:1
  • 4:3
  • 4:5
    (8:10)
  • 3:2(6:4)
  • Custom
    :

Scale

* You can move the image by dragging it.

S
  • 640 x 480px
  • 22.6 x 16.9cm (72dpi)
JPG US$5.00
M
  • 2000 x 1500px
  • 16.9 x 12.7cm (300dpi)
JPG US$15.00
L
  • 2997 x 2248px
  • 25.4 x 19.0cm (300dpi)
JPG US$30.00
Ex Add an Extended License +US$30.00
Total :
Design with this image

With this editor tool,
you can create a design with PIXTA items before purchasing.
Click here for details.