Subscription

PIXTA Exclusive

Stock Photo: Gantt chart_Product design close-up_Pointing 1

Item number : 88773547 See all

This Stock Photo, whose title is "Gantt chart_Product design close-up_Pointing 1"[88773547], includes tags of chart, business, graph. The author of this item is Lukas (No.1289517). Sizes from S to XL are available and the price starts from US$5.00. You can download watermarked sample data (comp images), check the quality of images, and use Lightbox after signing up for free. See all

Gantt chart_Product design close-up_Pointing 1 88773547

Gantt chart_Product design close-up_Pointing 1

*PIXTA Exclusive is only available on PIXTA site or affiliated sites with PIXTA.

  • 1:1
  • 4:3
  • 4:5
    (8:10)
  • 3:2(6:4)
  • Custom
    :

Scale

* You can move the image by dragging it.

S
  • 640 x 426px
  • 22.6 x 15.0cm (72dpi)
JPG US$5.00
M
  • 2000 x 1333px
  • 16.9 x 11.3cm (300dpi)
JPG US$15.00
L
  • 4000 x 2667px
  • 33.9 x 22.6cm (300dpi)
JPG US$30.00
XL
  • 8192 x 5464px
  • 69.4 x 46.3cm (300dpi)
JPG US$50.00
Ex Add an Extended License +US$30.00
Total :
Design with this image

With this editor tool,
you can create a design with PIXTA items before purchasing.
Click here for details.