Subscription
Stock Photo: Aerial detail view of the famous Eiermann Campus in Stuttgart that was planned by famous Bauhaus architect Egon Eiermann from 1965 on and was used as an office space until 2009. Since then it is
Item number : 72090650 See all
This Stock Photo, whose title is "Aerial detail view of the famous Eiermann..."[72090650], includes tags of aerial, city, building. The author of this item is franky242 (No.303097). Sizes from S to L are available and the price starts from US$5.00. You can download watermarked sample data (comp images), check the quality of images, and use Lightbox after signing up for free. See all
Aerial detail view of the famous Eiermann Campus in Stuttgart that was planned by famous Bauhaus architect Egon Eiermann from 1965 on and was used as an office space until 2009. Since then it is
Scale
* You can move the image by dragging it.
Credits(copyright) : franky242 / PIXTA
- About Model and Property Release
- Made at : 2020-11-15
- Views : 116
- Past purchases : No
- Contact Contributor to Ask About This Item
