Subscription

Stock Photo: Construction is underway to lay temporary tracks on the Urban Park Line between Kasukabe and Yagisaki stations in preparation for the elevated railway project at Kasukabe Station.

Item number : 143025527 See all

This Stock Photo, whose title is "Construction is underway to lay temporary..."[143025527], includes tags of pontoon bridge, omiya, edo river. The author of this item is ishi_ae86 (No.383962). Sizes from S to XL are available and the price starts from US$5.00. You can download watermarked sample data (comp images), check the quality of images, and use Lightbox after signing up for free. See all

Construction is underway to lay temporary tracks on the Urban Park Line between Kasukabe and Yagisaki stations in preparation for the elevated railway project at Kasukabe Station. 143025527

Construction is underway to lay temporary tracks on the Urban Park Line between Kasukabe and Yagisaki stations in preparation for the elevated railway project at Kasukabe Station.

  • 1:1
  • 4:3
  • 4:5
    (8:10)
  • 3:2(6:4)
  • Custom
    :

Scale

* You can move the image by dragging it.

S
  • 640 x 426px
  • 22.6 x 15.0cm (72dpi)
JPG US$5.00
M
  • 2000 x 1333px
  • 16.9 x 11.3cm (300dpi)
JPG US$15.00
L
  • 4000 x 2666px
  • 33.9 x 22.6cm (300dpi)
JPG US$30.00
XL
  • 6000 x 4000px
  • 50.8 x 33.9cm (300dpi)
JPG US$50.00
Ex Add an Extended License +US$30.00
Total :
Design with this image

With this editor tool,
you can create a design with PIXTA items before purchasing.
Click here for details.

Stock Photo: Construction is underway to lay temporary tracks on the Urban Park Line between Kasukabe and Yagisaki stations in preparation for the elevated railway project at Kasukabe Station. tags