Subscription

Stock Photo: A light blue background with a project schedule and red pen.

Item number : 138016903 See all

This Stock Photo, whose title is "A light blue background with a project schedule..."[138016903], includes tags of schedule, pen, pens. The author of this item is hanasakikazunari (No.250756). Sizes from M to XL are available and the price starts from US$15.00. You can download watermarked sample data (comp images), check the quality of images, and use Lightbox after signing up for free. See all

A light blue background with a project schedule and red pen. 138016903

A light blue background with a project schedule and red pen.

  • 1:1
  • 4:3
  • 4:5
    (8:10)
  • 3:2(6:4)
  • Custom
    :

Scale

* You can move the image by dragging it.

S This size is not available. JPG US$5.00
M
  • 2000 x 1334px
  • 16.9 x 11.3cm (300dpi)
JPG US$15.00
L
  • 4000 x 2668px
  • 33.9 x 22.6cm (300dpi)
JPG US$30.00
XL
  • 7952 x 5304px
  • 67.3 x 44.9cm (300dpi)
JPG US$50.00
Ex Add an Extended License +US$30.00
Total :
Design with this image

With this editor tool,
you can create a design with PIXTA items before purchasing.
Click here for details.