Subscription

Stock Photo: Jan 18 2026 Major cavern construction progresses within Anderson Road Quarry site

Item number : 135850599 See all

This Stock Photo, whose title is "Jan 18 2026 Major cavern construction..."[135850599], includes tags of construction, site, architecture. The author of this item is figure (No.2412080). Sizes from S to XL are available and the price starts from US$5.00. You can download watermarked sample data (comp images), check the quality of images, and use Lightbox after signing up for free. See all

Jan 18 2026 Major cavern construction progresses within Anderson Road Quarry site 135850599

Jan 18 2026 Major cavern construction progresses within Anderson Road Quarry site

  • 1:1
  • 4:3
  • 4:5
    (8:10)
  • 3:2(6:4)
  • Custom
    :

Scale

* You can move the image by dragging it.

S
  • 640 x 360px
  • 22.6 x 12.7cm (72dpi)
JPG US$5.00
M
  • 2000 x 1125px
  • 16.9 x 9.5cm (300dpi)
JPG US$15.00
L
  • 4000 x 2250px
  • 33.9 x 19.0cm (300dpi)
JPG US$30.00
XL
  • 6133 x 3450px
  • 51.9 x 29.2cm (300dpi)
JPG US$50.00
Ex Add an Extended License +US$30.00
Total :
Design with this image

With this editor tool,
you can create a design with PIXTA items before purchasing.
Click here for details.

Stock Photo: Jan 18 2026 Major cavern construction progresses within Anderson Road Quarry site tags

Description / Comment
scale infrastructure works shape new cavern facilities underground Jan 18 2026