Subscription

Stock Photo: Collaborative Teamwork Planning and Organization with Gantt Chart and Task List Displayed on a Wooden Table Surface Gantry

Item number : 133707666 See all

This Stock Photo, whose title is "Collaborative Teamwork Planning and..."[133707666], includes tags of calendar, team, teamwork. The author of this item is World Image (No.866962). Sizes from S to XL are available and the price starts from US$5.00. You can download watermarked sample data (comp images), check the quality of images, and use Lightbox after signing up for free. See all

Collaborative Teamwork Planning and Organization with Gantt Chart and Task List Displayed on a Wooden Table Surface Gantry 133707666

Collaborative Teamwork Planning and Organization with Gantt Chart and Task List Displayed on a Wooden Table Surface Gantry

  • 1:1
  • 4:3
  • 4:5
    (8:10)
  • 3:2(6:4)
  • Custom
    :

Scale

* You can move the image by dragging it.

S
  • 640 x 242px
  • 22.6 x 8.5cm (72dpi)
JPG US$5.00
M
  • 2000 x 759px
  • 16.9 x 6.4cm (300dpi)
JPG US$15.00
L
  • 4000 x 1518px
  • 33.9 x 12.9cm (300dpi)
JPG US$30.00
XL
  • 6330 x 2403px
  • 53.6 x 20.3cm (300dpi)
JPG US$50.00
Ex Add an Extended License +US$30.00
Total :
Design with this image

With this editor tool,
you can create a design with PIXTA items before purchasing.
Click here for details.

Stock Photo: Collaborative Teamwork Planning and Organization with Gantt Chart and Task List Displayed on a Wooden Table Surface Gantry tags

Description / Comment
A dynamic team collaborates around a wooden table, showcasing a Gantt chart and task list, highlighting effective planning and organizational strategies for success. Gantry