Subscription

Stock Photo: Before pouring foundation for house, ground is covered with first layer of insulation waterproofing.

Item number : 112778626 See all

This Stock Photo, whose title is "Before pouring foundation for house, ground is..."[112778626], includes tags of construction, construction site, pipe. The author of this item is ungvar (No.804873). Sizes from S to XL are available and the price starts from US$5.00. You can download watermarked sample data (comp images), check the quality of images, and use Lightbox after signing up for free. See all

Before pouring foundation for house, ground is covered with first layer of insulation waterproofing. 112778626

Before pouring foundation for house, ground is covered with first layer of insulation waterproofing.

  • 1:1
  • 4:3
  • 4:5
    (8:10)
  • 3:2(6:4)
  • Custom
    :

Scale

* You can move the image by dragging it.

S
  • 640 x 426px
  • 22.6 x 15.0cm (72dpi)
JPG US$5.00
M
  • 2000 x 1333px
  • 16.9 x 11.3cm (300dpi)
JPG US$15.00
L
  • 4000 x 2667px
  • 33.9 x 22.6cm (300dpi)
JPG US$30.00
XL
  • 5432 x 3623px
  • 46.0 x 30.7cm (300dpi)
JPG US$50.00
Ex Add an Extended License +US$30.00
Total :
Design with this image

With this editor tool,
you can create a design with PIXTA items before purchasing.
Click here for details.