Subscription

PIXTA Exclusive

Stock Photo: The upstream part of the Akagawa dam will be submerged due to the completion of Naruse Dam, Akita Prefecture, November 2023

Item number : 108855486 See all

This Stock Photo, whose title is "The upstream part of the Akagawa dam will be..."[108855486], includes tags of autumn, autumnal, maple. The author of this item is musoaki (No.58901). Sizes from S to XL are available and the price starts from US$5.00. You can download watermarked sample data (comp images), check the quality of images, and use Lightbox after signing up for free. See all

The upstream part of the Akagawa dam will be submerged due to the completion of Naruse Dam, Akita Prefecture, November 2023 108855486

The upstream part of the Akagawa dam will be submerged due to the completion of Naruse Dam, Akita Prefecture, November 2023

*PIXTA Exclusive is only available on PIXTA site or affiliated sites with PIXTA.

  • 1:1
  • 4:3
  • 4:5
    (8:10)
  • 3:2(6:4)
  • Custom
    :

Scale

* You can move the image by dragging it.

S
  • 640 x 426px
  • 22.6 x 15.0cm (72dpi)
JPG US$5.00
M
  • 2000 x 1333px
  • 16.9 x 11.3cm (300dpi)
JPG US$15.00
L
  • 4000 x 2666px
  • 33.9 x 22.6cm (300dpi)
JPG US$30.00
XL
  • 5568 x 3712px
  • 47.1 x 31.4cm (300dpi)
JPG US$50.00
Ex Add an Extended License +US$30.00
Total :
Design with this image

With this editor tool,
you can create a design with PIXTA items before purchasing.
Click here for details.

Stock Photo: The upstream part of the Akagawa dam will be submerged due to the completion of Naruse Dam, Akita Prefecture, November 2023 tags