Subscription

Stock Photo: Gantt chart and keypad

Item number : 10085678 See all

This Stock Photo, whose title is "Gantt chart and keypad"[10085678], includes tags of pen, gantt, keypad. The author of this item is leungchopan (No.317477). Sizes from S to XL are available and the price starts from US$5.00. You can download watermarked sample data (comp images), check the quality of images, and use Lightbox after signing up for free. See all

Gantt chart and keypad 10085678

Gantt chart and keypad

  • 1:1
  • 4:3
  • 4:5
    (8:10)
  • 3:2(6:4)
  • Custom
    :

Scale

* You can move the image by dragging it.

S
  • 426 x 640px
  • 15.0 x 22.6cm (72dpi)
JPG US$5.00
M
  • 1333 x 2000px
  • 11.3 x 16.9cm (300dpi)
JPG US$15.00
L
  • 2666 x 4000px
  • 22.6 x 33.9cm (300dpi)
JPG US$30.00
XL
  • 3300 x 4950px
  • 27.9 x 41.9cm (300dpi)
JPG US$50.00
Ex Add an Extended License +US$30.00
Total :
Design with this image

With this editor tool,
you can create a design with PIXTA items before purchasing.
Click here for details.