Subscription

Stock Illustration: Woman holding a tablet, pointing at a supply chain flowchart with icons for buildings, factory, warehouse, globe, airplane, truck, shopping cart. Ideal for business strategy, logistics planning

Item number : 126500984 See all

This Stock Illustration, whose title is "Woman holding a tablet, pointing at a supply..."[126500984], includes tags of woman, marketing, vector. The author of this item is robuart (No.312034). Sizes from S to XL including Vector are available and the price starts from US$5.00. You can download watermarked sample data (comp images), check the quality of images, and use Lightbox after signing up for free. See all

Woman holding a tablet, pointing at a supply chain flowchart with icons for buildings, factory, warehouse, globe, airplane, truck, shopping cart. Ideal for business strategy, logistics planning 126500984

Woman holding a tablet, pointing at a supply chain flowchart with icons for buildings, factory, warehouse, globe, airplane, truck, shopping cart. Ideal for business strategy, logistics planning

  • 1:1
  • 4:3
  • 4:5
    (8:10)
  • 3:2(6:4)
  • Custom
    :

Scale

* You can move the image by dragging it.

S
  • 640 x 280px
  • 22.6 x 9.9cm (72dpi)
JPG US$5.00
M
  • 2000 x 875px
  • 16.9 x 7.4cm (300dpi)
JPG US$15.00
L
  • 4000 x 1751px
  • 33.9 x 14.8cm (300dpi)
JPG US$30.00
XL
  • 6851 x 3000px
  • 58.0 x 25.4cm (300dpi)
JPG US$50.00
V Vector EPS US$35.00
Ex Add an Extended License +US$30.00
Total :
Design with this image

With this editor tool,
you can create a design with PIXTA items before purchasing.
Click here for details.

Stock Illustration: Woman holding a tablet, pointing at a supply chain flowchart with icons for buildings, factory, warehouse, globe, airplane, truck, shopping cart. Ideal for business strategy, logistics planning tags