Subscription

Stock Illustration: Risk matrix analysis chart. Strategy infographics for assessing data strategy

Item number : 113754976 See all

This Stock Illustration, whose title is "Risk matrix analysis chart. Strategy..."[113754976], includes tags of chart, analysis, graph. The author of this item is pegasustudio (No.1578391). Sizes from S to XL including Vector are available and the price starts from US$5.00. You can download watermarked sample data (comp images), check the quality of images, and use Lightbox after signing up for free. See all

Risk matrix analysis chart. Strategy infographics for assessing data strategy 113754976

Risk matrix analysis chart. Strategy infographics for assessing data strategy

  • 1:1
  • 4:3
  • 4:5
    (8:10)
  • 3:2(6:4)
  • Custom
    :

Scale

* You can move the image by dragging it.

S
  • 640 x 188px
  • 22.6 x 6.6cm (72dpi)
JPG US$5.00
M
  • 2000 x 588px
  • 16.9 x 5.0cm (300dpi)
JPG US$15.00
L
  • 4000 x 1176px
  • 33.9 x 10.0cm (300dpi)
JPG US$30.00
XL
  • 8246 x 2425px
  • 69.8 x 20.5cm (300dpi)
JPG US$50.00
V Vector EPS US$35.00
Ex Add an Extended License +US$30.00
Total :
Design with this image

With this editor tool,
you can create a design with PIXTA items before purchasing.
Click here for details.

Stock Illustration: Risk matrix analysis chart. Strategy infographics for assessing data strategy tags

Description / Comment
Risk matrix analysis chart. Strategy infographics for assessing data strategy with process management and diagram of safe decisions with the probability of vector impacts