Subscription
Stock Footage: As part of building construction process, all communications and thermal insulation are installed in new building before plasterboard can be installed
Item number : 98100869 See all
This Stock Footage, whose title is "As part of building construction process, all..."[98100869], includes tags of pipeline, construction, pipe. The author of this item is ungvar (No.804873). Sizes from WEB (S) to 4K are available and the price starts from US$15.00. You can download watermarked sample data (comp images), and use Lightbox after signing up for free. See all
As part of building construction process, all communications and thermal insulation are installed in new building before plasterboard can be installed
- Length : 00:00:20
- Audio : None
- Aspect ratio : 17:9
- Format : mov+mp4
- Frame rate : 30.00
- Codec : ProRes
Credits(copyright) : ungvar / PIXTA
- About Model and Property Release
- Views : 49
- Past purchases : No
- Contact Contributor to Ask About This Item